Planning & Acceptance Checklist
Inventory source tests, preserve assertions and dependencies, compare parallel runs, control cutover, and document rollback for a ContextQA migration.
Quick answer
Before converting tests, reconcile the source inventory, classify dependencies, select a representative pilot, and define assertion, failure, evidence, effort, and rollback gates. Migrate in waves, never from an unreviewed bulk import. Every source asset needs a final disposition—migrated, retained, replaced by another control, or retired with approval—and every release-critical ContextQA test needs a normal run plus a controlled failure that proves its assertion can fail.
Copy the migration charter
Decision:
Source platform/framework and version:
Source repository/workspace:
ContextQA workspace:
Business owner:
Migration owner:
Technical reviewers:
Security/release reviewers:
In-scope applications and environments:
Out-of-scope tests and why:
Pilot cohort:
Target overlap window:
Required evidence:
Acceptance gates:
Rollback trigger and owner:
Decision date:Keep the charter versioned. If scope changes, add a dated decision rather than replacing the original baseline silently.
Phase 1: Inventory the source
Suite-level inventory
Pilot / Later / Retain / Review
Test-level inventory
Look beyond test files. Inventory:
page objects, screen abstractions, reusable modules, fixtures, hooks, and helper libraries;
setup and teardown jobs;
environment files and secret references;
data factories, database tasks, API setup, email/SMS inboxes, and file fixtures;
browser projects, grids, mobile devices, proxies, tunnels, certificates, and locales;
CI triggers, retry policies, sharding, concurrency, and required-check names;
screenshots, videos, logs, traces, reports, retention, and audit exports; and
requirement, defect, and test-management links.
Reconciliation equation
Use counts only as a completeness control:
The equation should balance for each migration wave. A balanced count does not prove coverage; the assertion review does.
Phase 2: Classify conversion difficulty
A — direct
Linear UI flow, explicit assertions, simple data
Analyze/import, review, run
B — structured
Reusable helpers, parameters, setup/cleanup, multiple projects
Map dependencies and rebuild supporting configuration
C — custom
Code, loops, conditionals, downloads, visual checks, external services
Create a design note and prove feasibility individually
D — proprietary
Model-based objects, binary/source-vendor format, undisclosed runtime behavior
Intent-led reconstruction or retain source control
E — obsolete/duplicate
No current requirement, never runs, duplicates another control
Retire only with owner approval
Select the pilot across A through D. A pilot containing only Class A cannot validate the broader migration.
Phase 3: Define behavior packets
Create one packet per business behavior:
Behavior ID
Stable migration identifier
Business risk
What could go wrong for a user or system
Source references
Test IDs/paths and revision
Preconditions
Role, tenant, records, feature flags, build
Actions
User or system behavior, not source-framework syntax
Positive assertions
Expected successful outcomes
Negative assertions
Disallowed or error behavior
Persisted-state assertions
API/database/next-page evidence when required
Data lifecycle
Create, isolate, reset, and cleanup
Environment matrix
Browser/device/network/locale requirements
Evidence
Source and ContextQA run/artifact references
Limitations
Unsupported or intentionally excluded behavior
Owner/reviewer
Accountable people
This packet prevents a migration from turning an assertion-rich test into a sequence of clicks.
Phase 4: Prepare the ContextQA destination
Do not let imported tests enter a required CI gate until their acceptance record is complete.
Phase 5: Convert a representative pilot
For supported repositories, follow MCP-assisted migration: analyze, dry run, inspect skipped items, migrate, and review. For unsupported platforms, follow the relevant Tosca or mabl staged path.
Use a pilot cohort containing:
a release-critical happy path;
a negative permission or validation case;
parameterized data;
a reusable setup or authentication dependency;
a custom integration or file operation;
at least two required browsers/devices if applicable;
a historically flaky or maintenance-heavy test; and
a failure that needs diagnostic evidence.
Phase 6: Review assertion integrity
Reject the migrated case when:
an assertion became a navigation step;
a denied action is verified only by the absence of an error;
a persisted-state expectation is checked only visually;
an unexpected skip can still produce a pass;
data setup makes the assertion vacuously true; or
a broad visual judgment replaces an exact financial, security, or data-integrity check.
Phase 7: Prove the test can fail
For each critical behavior:
Run the ContextQA test against the known-good immutable build.
Record the run and expected passing assertions.
Introduce one reversible defect in a disposable fixture or branch.
Run the same test and configuration.
Verify that the intended assertion fails for the intended reason.
Restore the fixture and rerun.
Never seed a defect in production or a shared environment without explicit coordination.
Phase 8: Compare source and ContextQA in parallel
Run the same behavior packet against the same application build and data revision.
Product / Test / Data / Environment / Unknown
Classify every divergence. Do not discard a difference because the preferred tool passed.
Measure:
test creation and migration review time;
routine execution and queue time;
false passes and false failures under the agreed protocol;
failure-triage time;
maintenance intervention;
incomplete, canceled, timed-out, and retried runs; and
evidence availability to the release reviewer.
Phase 9: Decide each source test’s disposition
Migrated
Accepted ContextQA behavior packet replaces the source control
Test owner and release owner for critical coverage
Retained
Source test remains authoritative for a named requirement
Test owner
Replaced
Another control owns the behavior
Owners of both controls
Retired
Requirement is obsolete, duplicative, or no longer worth the cost
Business/test owner with rationale
Unresolved
Decision lacks evidence
Migration owner and due date; no silent cutover
Phase 10: Cut over with rollback
Before cutover:
Rollback triggers can include:
an unexplained false pass in a critical behavior;
missing evidence during a release;
repeated queue/execution behavior outside the accepted threshold;
environment or network incompatibility;
critical test data contamination; or
an unresolved authentication or authorization regression.
Migration acceptance record